Shower room installation knowledge attention to detail attention to wall impermeable

The shower culture is gradually valued in modern people's life, and it displays endless charm and vitality. It is the highlight of home decoration to decorate the bathroom and create a romantic life. In addition to being pleasing, please pay attention to the wall. Impervious, concrete drainage and floor drain details are handled in detail to avoid any future problems.

Wall impervious treatment

The rough house wall of the real estate company is not waterproofed. Before the tile is tiled, a layer of impervious cement shall be scraped and then tiled. After finishing the tile, the decoration worker shall ask the decoration worker to perform wall joint processing on the tile joints. This will prevent the toilet water from permeating through the brick seams to the exterior walls, so that it will not suffer. Drainage and floor drain treatment? Because of the prevention of deodorants and the prevention of infectious diseases, the State requires that a concave pool gooseneck curved pipe be designed for construction, and the toilet floor should have a primary drainage system, but once the water seeps through the ground or the water supply pipeline. The entire restroom of the toilet will be filled with dirty water, and no water will penetrate the wall or penetrate the wall and penetrate into the room corner or into the lower floor. Therefore, in the bottom of the concave pool should be set to two drainage pipe mouth, in the ground with a seepage cement scraping a good brick seam, if the home improvement do first- and second-level drainage system, eliminating the many annoyances in the future.

Bathroom Design Shower Room Features

Today, with each passing day, people are increasingly pursuing the culture of the bathroom. Designing a simple and practical shower room in the bathroom has become a fashion. Choosing a quality shower room not only allows us to enjoy the pleasure of showering, but also avoids the tedious and frequent cleaning of dirty water spills. Therefore, we should pay more attention to the effect of dry and wet sections on the premise of keeping warm. Carefully build a professional production of shower room series, in the human design, water-tight enough to ensure that your bathroom's dry and wet distinctions, add grace to your bathroom life!

Designing a shower room

When designing the shower room, first consider the size of the bathroom, choose the layout that best suits your own bathroom, and choose a frameless or framed product that suits your preferences. Then, to the bottom of the treatment (with stone basins, stone base) selection, bathroom sill, toilet seats, bathtubs, wall columns, from the wash basin, toilet distance, open the way to comprehensive design, a comfortable and pleasant The shower room is the perfect design.

Combination of shower room style and bathroom size

For the size of the bathroom, select the appropriate shower room product. The large space can be considered from the perspective of comfortable and loose showers, with multiple options, while the small space should make full use of the area, to choose some push-pull designs and interior design that do not occupy the place as well, combined with the boutique rack, go Make full use of space, in the choice of style should also consider the shower and bathroom with the overall effect, the choice of shape (such as square or arc) should be as much as possible with the wash basin and toilet shape, reasonable layout to create a relaxed environment.

Non-standard shower room program

The best way to choose the shower room is to design the appropriate size in advance and to pre-embed the corresponding hole position before the bathroom is not renovated. If the water supply system has been installed and tiled floor tiles are attached, there should be a tailor-made shower room. Design shower room can choose standard, can also be based on the size of the bathroom, the actual situation of professional non-standard order, and to buy the shower room in the building materials market, first of all, need to have clearly marked size of the bathroom structure diagram for the store salesperson reference design , You can also invite professional designers to design on the site, draw the drawings on the basis of the overall site conditions and their own preferences, determine the factors are complete, and then arrange the manufacturers to produce. Non-standard shower room production cycle and transport time is about 20 days, then, the factory professional installation of technical personnel can be installed.