Stepping on the right foot to save renovation time

The reserved water supply and drainage location does not match, and the bought toilet cannot be installed; the concealment project is finished, and the best paving time is missed because the tiles have not yet been delivered; the wooden door can be installed to install the floor, and the wooden door is ordered to be finished. Wait 40 days ... ... complex home improvement For non-professional pretender, there will always be endless wall. "A lot of building materials furniture must be matched with the decoration process, or the construction of a certain degree to be able to set a specific model, communicate with the designer in advance, otherwise it will bring the late and the entire decoration style does not match, or because it is not applicable and need to change the model or Return and exchange will affect the home improvement process.” Xu Gong, who has been involved in the home improvement industry for 25 years and has extensive experience in decoration, truthfully said.

Xiao Bian specially asked the experts, pretending to buy furniture, building materials, time, so that pretenders step on the quasi-step, saving decoration time, to ensure smooth decoration.

>>> Link: How to arrange the steps and cycles of the renovation?

A

Before renovation

Before designing

Look at the furniture to find the feeling

For pretenders who do not have much decoration concepts and do not understand many professional terms, it is really difficult to accurately and easily express to designers what they want to decorate and feel at home. Therefore, professionals are advised to visit the furniture store before decorating and go to the atmosphere of those furniture settings. Have time to look at the main materials such as floors, tiles and bathrooms.

You can find inspiration in various furniture scenes with different styles, and you can find out which furniture you can buy on the market. If possible, you can photograph your favorite furniture space. When communicating with the designer, you can't use words to convey feelings. You can use these photos to convey information to the designers. At the same time, it can also ensure that the designer's design can be combined with the actual furniture you need to buy, avoid the purchase of designer furniture after the renovation, resulting in an awkward situation in which the design effect is greatly reduced.

Designing a map

First arrange heating and central air conditioning

Approved design plan, pretend to allow the design of drawings, if there is floor heating, central air conditioning will consider the first hands, because floor heating and central air conditioning are non-renovation company construction part, need to be completed before the renovation starts.

Generally, it takes four to five days for the warmth to be built. During the construction of the floor heating, the renovation works cannot be carried out. Therefore, the installer who purchased the floor heating can complete the floor heating before the renovation, which will save time. The central air-conditioning system is also best to be set before the start of construction. The arrangement of fans and pipes will be completed in advance.

It is necessary to remind installers that although floor heating and central air-conditioning are professionals for construction, designers from home improvement companies, home improvement company project managers, and electricians all need to be on the scene, because several parties need to coordinate the circuit in the next hidden project. Directions and considerations.

Before construction

Set the cabinet and buy a bathroom

Kitchens and bathrooms are the best places to reflect the quality of home life. Cabinets and bathrooms are of course the highlights of the mainstay of decoration, and their location, size, and model are required to inform the construction team in advance.

First of all, cabinets are mainly functional partitions. It is necessary to order the cabinets before the hydropower reforms, so that the cabinet manufacturers can make preliminary measurements, determine the location of the cabinets, use methods, and tell the designers and project managers how to place the electric appliances and install the sinks. Position, when the hydropower reform can accurately reserve the location of the electrical outlet and the water supply and drainage location of the sink. After the bricks are finished, the cabinet manufacturers will also make a second accurate measurement.

Secondly, toilets or squatting pans, basins, and bathroom cabinets or washstands that are placed on the basins need to be set before construction, because different toilets or squatting devices have different ways of entering and leaving water, such as toilet models, The size is not the same, the size of the drainage hole is not the same, and the squatting pan also needs to determine whether it is “forward water, after drainage”, or “after inflow, front drainage”, in addition to the diameter requirement of the inlet pipe. Similarly, basins and bathroom cabinets or washstands on which the basins are placed need to be ordered in advance, and it is also to confirm whether “water drainage” or “drainage” is used in waterway reconstruction. Only accurate and accurate can ensure that the sanitary ware purchased after tiling can be installed.


>>> Links: General Pre-Decoration Process

B

Decoration

Renovation starts

You have to buy a wall tile

“The concealed project can be purchased once it starts.” Professionals pointed out that the next step in the concealment project is tiling, and the construction time of a typical hidden project is also a week or two. Wall tiles need to be purchased and delivered. Nearly a week.

As long as it is determined that the planning and structure of the house will not change after the renovation is started, the wall and floor tiles should be immediately reserved. If the structure is to be reconstructed in the middle of construction, the tiles may not be used. Before booking, it's best to find a designer to help estimate the area of ​​laying wall tiles and floor tiles to ensure that they are accurate to the specifications and quantity at the time of purchase.

Of course, the integrated ceiling is also a big part of the bathroom and the kitchen. It is best to be done after the tiles have been attached. In other words, when purchasing the tiles, you should also be able to buy the integrated ceiling to make the colors of the tiles and integrated ceilings. And style can be harmonized.

Tile finished

Wooden doors and floors must be set

At present, most of the wooden doors in the market are not in stock, and they need to be measured by the manufacturer to the construction site. According to the actual size of the door opening, it takes at least 40 days from order to delivery. Therefore, after the tile is finished, the wooden door should be set immediately, but it must be after the tile is finished to find the wooden door manufacturer to measure accurately, because the size of the door hole after the tiling changes greatly.

Although floors are mostly in stock, experts suggest that when buying wooden doors, you should consider buying floors because the combination of doors and floors is very important. In addition to the wall shapes, the most visually pleasing in the room is the wooden doors and floors. The overall effect. In addition to visual effects, the ground connection of toilets, kitchens, living rooms, and bedrooms is also very important. Different rooms have different conditions for paving and flooring, which can easily cause heights in the transition of the entire space, uneven ground, and inconvenience to life. . Therefore, the floor can be determined by ordering the floor in advance, and the floor thickness can be determined. The ground leveling method can be used to prepare in advance to ensure that the floor of the post-paving floor is maintained at the same height.

Wooden construction

It's time to buy a closet door

Wall cabinets are custom-made after the factory site measurement, but also should be customized in advance, generally in the wood work can be started to buy, this time to buy a closet door, you can also coordinate the color of wood, material effects and closet door color , styles, such as the closet doors and wood panels and colors do not match, you can also replace.

In addition, the closet door is related to the flatness of the ground. If the floor height is not taken into consideration, the closet door may not be installed later. Therefore, the size of the closet door is measured at this time. If the leveling of the closet is not enough, it can be leveled on the ground floor to avoid leveling the floor afterwards. It is not necessary to increase the decoration cost and may also affect Effect. If you need to install stairs at home, this time should be customized according to the style.

>>Links: Experts Weapons: Ingenious Arrangement of Renovation Process

C

After construction

The late construction period refers to the completion of painting in wood and the painting of latex paint on the wall. At this time, the renovation has come to an end. The installer should consider the next hardware fittings and soft ornaments to enter the arena.

The first thing that should be considered is the wallpaper. The wallpaper should be strictly synchronized with the latex paint wall. Because the wallpaper has the function of correcting and perfecting the interior decoration style and the overall effect, it is more appropriate to purchase later. At the same time, the curtains can also be selected first and the fabrics are ready for use. The shapes and colors of the curtains and walls are also closely related.

Secondly, consider buying hardware locks and grab them before the wooden door is installed to ensure the smooth installation of the wooden door manufacturers. The manufacturers of general doors have matching locks. As a result, lockers choose their own locks for the sake of saving. Because the locks are also part of the entire decoration project, their materials are directly related to the style of decoration. It is recommended that installers also purchase locks and consult designers.

The switch panel needs to wait for the completion of the entire basic decoration, that is, after the installation of the floor, wooden doors, and closet doors, consider the overall style and then purchase, which is conducive to the harmonization of interior styles.

Finally, the purchase of furniture, in fact, the style and shape of the furniture is generally optimistic about before the renovation, only need to be fine-tuned according to the final results of the actual decoration can be, of course, according to actual needs increase or decrease the initial setting need to display Furniture.

Renovation process Renovation design Wooden doors Furniture style Decorations Central air-conditioning Parlors Walls Colors Decorations Find Decorations Companies How do I Decorate living room Decoration styles Kitchens Integrated ceilings Wall cabinets Doors Cabinets Doors Kitchens Wall tiles Kitchen doors Doors Floorings Brick wall Cabinet doors Bathroom tiles Bathroom doors Bathroom tiles Color Bathroom Wall Tiles Bathroom Dimensions Bathroom Floor Tiles Bathroom Ceilings Overall Bathroom Toilet Design Toilet Door Dimensions Home Furnishing Home Decoration Home Tile Glue Tiles Specifications Home Furnishing Kitchen Tiles Small Bedrooms Floor Tiles Decoration Home

Mancozeb is Fungicide used For field crops, fruits, vegetables, nuts, and commercial sod farms. Seed treatment for cereal grains, corn, cotton, flax, peanuts, potatoes, safflower, sorghum, and tomatoes. Trimastan for potato blight and Cercospera of sugar beets and celery. Fore for flowers, ornamental trees, shrubs, turf sod, and golf courses. Electis, Gavel and Roxam Combi for use on grapevines. Aderio, Valbon for use on potatoes

Mancozeb

Mancozeb Fungicide,Agricultural Fungicide Mancozeb,Mancozeb Fungicide Lowes,Complex State Mancozeb

Shijiazhuang Dailun Chemical Co., Ltd. , http://www.dailunchem.com