Explain what you need to pay attention to after the floor is laid.

After the floor is laid, it must be maintained for at least 24 hours to make it cement and solidify, so as to avoid loosening of the ground and affect its service life. If the floor is finished and you are not in a hurry to enter, you should open the window for ventilation during the day and balance with the outdoor environment. Must not close the window for a long time to close the door, not ventilated, airtight, easy to deform the floor. Because during the construction, the wall paint, wall tiles, floor tiles, and the original building's residual moisture, paint volatilization, etc. will not be fully emitted during the decoration process, and these moisture will be absorbed by the dry floor and cause the floor to deform.

Nature floor del floor window paint decorative paint floor tile

Shuttering Plywood

Shuttering Plywood,18mm Shuttering Plywood,Glue Shuttering Plywood

Linyi Chanta Plywood Co., Ltd. , http://www.lyplywood.com