Waterproof and leakproof in the bathroom is very important. The construction method is the most important.

Waterproof and leakproof in the bathroom is very important, and the construction method is the most important.

After preparing the materials, you can construct them in three steps:

The first step is to level the ground. If you want to replace the floor tiles of the bathroom, after removing the original floor tiles, you must first level the floor with cement mortar and then do waterproofing. The seams should be painted in place because the seam between the wall and the floor of the bathroom and the joint between the upper and lower water pipes and the ground are most likely to seep;

In the second step, a waterproof coating of about 30 cm height is required on the wall surface to prevent water from penetrating the wall. However, if the wall of the bathroom is a non-load-bearing light-weight wall, the entire wall should be coated with waterproof paint. If there is a shower room in the bathroom, the two walls connected should also be covered; if it is a bathtub, the height of the wall waterproofing paint adjacent to the bathtub is higher than the upper edge of the bathtub;

The third step, the waterproof trapping experiment must be done seriously. After the construction is completed, all the toilet water will be blocked, and a wall about 20 cm high will be built at the door. Then, about 15 cm high water will be poured into the bathroom. After 24 hours, the wall and the ground will be inspected for leakage. The waterproof test is the key to ensuring the quality of the bathroom waterproofing project. It must be done.