Floor maintenance

1. After the construction of the flat land is completed, it needs to be maintained for 7-10 days before it can be put into use. During the curing period, water or other solution should be avoided to infiltrate the surface.

2. Any employee who enters the workshop must be replaced with a rubber-soled shoe (no black-soled shoes with a foam bottom) (to avoid the sand from the outside being scratched into the workshop)

3. Any hardware: such as iron chairs, iron tables, iron shelves, etc., should be wrapped with soft plastic, rubber or paper pad to avoid scratching the ground during use.

4, the tractor needs to fully lift the board off the ground, please pay special attention to the corner of the board when cornering, do not scratch the ground

5, when cleaning the ground, please use a soft absorbent or a wet and dry vacuum cleaner, can be cleaned with water or detergent, but please pay attention to the ground slippery

6. If it is worn or scratched due to long use time, local repair can be carried out in a small area. If the area is large, it is recommended to re-roll once.

7. Before the equipment enters the factory, lay the bottom of the cardboard box on the floor to avoid scratching the ground during transportation.

8, the cart, the wheel of the cart, please use hard or elastic rubber wheel, and use separately inside and outside the plant

9, can be waxed according to the ground requirements (the effect can prevent ground scratches)

Others Wire

Razor Barbed Wire,Others Wire,Iron Wire

Common Iron Nail Co., Ltd. , http://www.cncommonnails.com