Which high-grade fine stone ultra-high pressure concrete pump is good, it is effective to do a good job of inspection


The application of fine stone concrete pumps in construction is very common, especially when the high-rise construction is helpful to the construction. However, customers are more concerned about which high-level fine stone super-high pressure concrete pump is good before use, and how to buy the appropriate equipment. This editor can only suggest that the customer and the manufacturer directly contact, not through an intermediary or others Only the direct manufacturers can sell the products at the ex-factory price, and provide good after-sales and guarantee the quality of the equipment.

China Hardware Business Network

Putting aside the good topic of high-rise fine stone ultra-high pressure concrete pumps, how can we make the equipment construction efficient, convenient and with a low failure rate? In order to achieve this effect, the relevant inspection work can be done to make the construction more effective.

1. Inspection of electrical equipment: The inspection of electrical equipment is mainly to do the following work: 1), check whether the current and temperature rise of the motor are within the standard range; 2), check that all instruments and indicators are normal Work; 3), check and keep the electrical equipment clean and dry to avoid electric leakage and electric shock; 4), do a good job in the handling of cable wires and remote control wires to avoid damage during construction.

China Hardware Business Network

2. Inspection work of the conveying pipeline: each pipeline joint should be fixed and there is no gap when connecting, otherwise the leakage of aggregate will occur during the construction process, resulting in waste of resources. If this point is not taken seriously before, it is necessary to suspend construction and dismantle and repair immediately when the fault occurs.

3. The inspection work of the hydraulic system: 1) Check the oil level, oil quality and oil temperature of the hydraulic oil tank to meet the requirements of the construction; 2) Check the loss of all valves in the hydraulic system and ensure energy storage The device, pressure gauge, etc. all work normally and correctly reflect the construction pressure value; 3). Connect and fix the hydraulic pipeline so that there will be no leakage of concrete aggregate during the construction process.

China Hardware Business Network

The high-level fine stone ultra-high pressure concrete pump is better, the responsible manufacturer will make the construction guaranteed. Therefore, the user can appropriately raise some problems in the construction to test the ability of the manufacturer when choosing, if the experienced manufacturer should be able to solve any problems well. This is also an important method to test the manufacturer's production capacity and operating experience.

================================================== ================================================== ======
15365198506 'Which high-rise fine stone ultra-high pressure concrete pump is good, it is effective to do a good job of inspection

Use and performance of Graphite electrodes

use

Used in steelmaking electric arc furnace, refining furnace, as conductive electrode; Used for industrial silicon furnace, phosphorus furnace and corundum furnace, as conductive electrode.

performance

High resistance to thermal shock and high mechanical strength

grade

High Power Graphite Electrode (SHP) high power Graphite Electrode (UHP) with high power graphite electrode (HP) with high power graphite electrode (R

Precautions for use of graphite electrodes

1. According to the capacity of the electric furnace and the load of transformer, the grade and diameter of the electrode are suitable

2. When loading the electric furnace, the bulk charge shall be placed in the bottom of the furnace so as not to break the electrode. In the process of smelting, the lime should not be conductive. Large masses of objects are concentrated directly below the electrode, otherwise it will affect the electrode and even cause the electrode to break.

3. Attention should be paid to the position of the furnace cover. If the furnace cover is offset, the cover of the furnace will be blown on the lifting electrode, causing the electrode to be damaged.

4. When connecting the electrode, if the defect of joint bolt is found, the connection should be made after replacement

5. After the electrodes are connected, if there is a gap in the connection surface, it is important to find out the reason

6. The electrode should be used vertically.

7. The electrode holder shall be sandwiched between the upper and lower levels of the top electrode, and shall not be sandwiched between the warning line and the middle electrode. Otherwise, the electrode column is easily broken

8. The raw materials and production techniques of different manufacturers may vary. The physical and chemical properties of the electrode are also different, and it is recommended that the joints and electrodes produced by different manufacturers should not be used in a different way.



High Power Graphite Electrode

High Power Graphite Electrode,Die-Cast Graphite Electrodes,Bone Bit Graphite Electrod,Thermal Graphite

Fengcheng Ruixing Carbon Products Co., Ltd , https://www.lnfcrxts.com