China's first privately-controlled high-speed railway was approved: Hangshaotai high-speed railway set up 8 stations

The Zhejiang Provincial Development and Reform Commission recently issued the "Reply on the preliminary design of the new Hangzhou-based Shaoxing-Taizhou railway." According to the approval, the new main line of the Hangshaotai Railway starts from Shaoxing North Station to Wenling Station, with a speed target of 350 kilometers per hour and 8 stations along the way. The newly-built Hangshaotai Railway starts at Shaoxing North Station, passes through Zhangzhou, Xinchang, Tiantai and Linhai, and then arrives at Taizhou Central Station. Then it continues southward and ends at Wenling. The new main line is 226.556 kilometers long. According to the standard of two-lane high-speed railway, the speed target value is 350 kilometers per hour. The entire line includes Shaoxing North Station (existing station), Dongguan, Sanjie, Zhangzhou Xinchang, Tiantai, Linhai (existing station), Taizhou Center and Wenling (both There are 8 stations waiting for the station. The Hangshaotai Railway is one of the first batch of social capital investment railway demonstration projects in the country. The private consortium led by Fosun Group signed a contract with the Zhejiang Provincial Government on September 11, 2017. At present, the Hangshaotai Railway has started construction and is expected to be completed by the end of 2021 according to the previous plan. After the completion, the three counties and cities of Zhejiang Yinzhou, Xinchang and Tiantai will end the history of the railway.

button battery

  

Lithium-fluorocarbon button battery products mainly include models of BR2016, BR2025 and BR2032, etc., it has the characteristics of small volume, long storage life, safety, wide working temperature range, and it can work normally under -40~+80℃.

Button Lithium-fluorocarbon Battery (Li-(CFx)n) Models Of BR1616

Shandong Zhongshan Photoelectric Materials Co., Ltd , https://www.chzsem.com